国产精品成人久久久久久久,久久精品一区,一区成人,亚洲精品视频久久久,亚洲成人91,www久久综合,91国内精品久久久

Transferred from-Mysteel: Tracking the production of the wrong peak of Tianjin Iron and Steel Enterprise

發(fā)布時間:[2019-1-12 9:23:49]    瀏覽量:3675次
[Introduction]
It is predicted that heavy pollution will occur in our city from January 11, 2019, in line with the yellow warning conditions for heavy pollution weather stipulated in the "Tianjin Heavy Pollution Weather Emergency Plan"(Tianjin Administrative Office Letter[2018] No. 65). A yellow warning of heavy pollution weather is hereby issued.
The people's governments of various districts and the responsible units are requested, in accordance with the division of responsibilities of the "Tianjin Heavy Pollution Weather Emergency Plan", to initiate Class III emergency response measures from 0:00 on January 11 to do a good job in dealing with heavy pollution weather.
[Survey sample profile]

1, the blast furnace survey sample selected a total of 7 parent flow steel mills in Tianjin, 16 blast furnaces, and the total design capacity of blast furnace was 20.3 million tons. At present, 11 blast furnaces are normally produced, and 5 blast furnaces are discontinued. According to the work plan of industrial enterprises in the 2018-2019 heating season of Tianjin, we investigated the production limit rating and actual production limit of various steel companies:


According to the construction of the above-mentioned steel mills, it is estimated that the actual operating rate of the 7 parent flow steel mills in Tianjin is 70 %.

2, rolling line survey samples involved building materials, wire, medium thick plate, strip steel, profile, seamless pipe a total of six varieties, a total of 29 rolling lines.
There are 5 building materials production lines(thread, round steel production lines), 3 normal production, the main production round steel, the discontinued 2 are long-term suspension of production, not affected by the heating season production limit.
There are 6 wire production lines(high lines, variety lines), 2 normal production, and the main production variety lines, 4 discontinued production is a long-term suspension of production, not affected by the heating season production limit.
The production line of medium thick plate is 1, and the output is slightly below the normal level.
There are 8 steel production lines, 7 normal production lines, and 1 production line upgrade.
There are 3 profiles and 1 line production.
Seamless tube production line 6, 1 normal production, adjustment of blank rolling material.

HomeBrief IntroductionOrganizationLetter Bridge NewsProduct CenterAptitude HonorHuman ResourcesContact Us

Mailbox:taxinqiao@163.com    Website:gzzffw.com
Shandong Xinqiao Industrial Co., Ltd.  Copyright         Technical support:Nuodun Network
Headquarters:0538-8151706    Fax:0538-8151704 Address:The new North Road of the steel market of Tai'ant
Branch:0538-5018001      Fax:0538-5018004 Address:Tai'an national Mountain Center

根河市| 全州县| 静乐县| 曲靖市| 五莲县| 莱芜市| 察雅县| 沂南县| 德令哈市| 白水县| 社旗县| 民县| 疏勒县| 盈江县| 北票市| 宜州市| 东丽区| 临西县| 山西省| 双城市| 涟水县| 苗栗市| 湄潭县| 克什克腾旗| 郯城县| 利川市| 虹口区| 衡东县| 汉寿县| 孟津县| 巫溪县| 隆化县| 马山县| 即墨市| 横山县| 彩票| 城市| 尤溪县| 漠河县| 榆社县| 临沭县|